Chapter III. Construction Plan
一、 施工階段劃分和施工順序
I. Division of Construction Phase & Construction Sequence
1、 施工階段劃分
Division of construction phase
①. 進(jìn)口設(shè)備的訂貨采購階段
Order and purchasing of imported equipment
②. 圖紙深化設(shè)計(jì)階段
Chart deepening design
③. 現(xiàn)場預(yù)留洞施工階段
On-site reserved hole construction
④. 進(jìn)場前臨時設(shè)施準(zhǔn)備階段。
Temporary facilities preparation before site entry
⑤. 施工階段
Construction phase
⑥. 完工后技術(shù)培訓(xùn)階段
Technical training upon construction completion
2、 施工順序
Construction sequence
槽內(nèi)清理→防水砂漿→防水涂料→保溫層→玻璃鋼防水層→閉水試驗(yàn)→混凝土板保護(hù)層→冰槽運(yùn)輸?shù)綀?rarr;冰槽就位→管道測量、下料→管道鍍鋅→管道安裝→管道沖洗、試壓→配合調(diào)試→提交竣工圖→竣工驗(yàn)收。
Trough cleaning → waterproof slurry → waterproof paint → heat preservation layer → glass steel waterproof layer → closed water testing → concrete plate protective layer → ice tank transported to site → ice tank preparation → pipeline measurement and charging → pipeline galvanization → pipeline installation → pipeline cleaning and pressure testing → debugging → delivery of construction completion chart → inspection and acceptance.
二、 施工機(jī)具
II. Machines and Tools for Construction
序號
No. 設(shè)備名稱
Name of Equipment 數(shù)量
Quantity 型號
Model 產(chǎn)地
Place of Origin 生產(chǎn)日期
Date of Manufacturing 生產(chǎn)能力Production Capacity 用途
Purpose
1 汽車吊crane 1 10t 柳州Liuzhou 2005 良好Excellent 運(yùn)輸
Transportation
2 貨車cargo vehicle 1 10t 長春Changchun 2004 良好Excellent 運(yùn)輸
Transportation
3 叉車forklift 1 CP5 柳州Liuzhou 2004 良好Excellent 運(yùn)輸
Transportation
4 客貨車passenger & cargo vehicle 1 2.5t 南京Nanjing 2004 良好Excellent 運(yùn)輸
Transportation
5 交流電焊機(jī)AC welder 3 BX-300 上海Shanghai 2005 良好Excellent 焊接
Welding
6 直流電焊機(jī)DC welder 2 AX-500 上海Shanghai 2005 良好Excellent 焊接
Welding
7 電動套絲機(jī)electric wiring machine 1 1/2″-3″ 杭州Hangzhou 2005 良好Excellent 套絲
Wiring
8 電動砂輪切割機(jī)electric abrasive cutter 4 Φ400 北京Beijing 2005 良好Excellent 切割
Cutting
9 焊條烘箱welding rod baker 1 ZYH-30 北京Beijing 2005 良好Excellent 焊接
Welding
10 萬向搖臂鉆 universal driller with jointed arm 1 Z32K 北京Beijing 2005 良好Excellent 安裝
Installation
11 電動角向磨光機(jī)electric angle grinder 6 Φ125 北京Beijing 2004 良好Excellent 安裝
Installation
12 水準(zhǔn)儀level meter 3 S1 日本Japan 2004 良好Excellent 安裝
Installation
13 經(jīng)緯儀theodolite 1 日本Japan 2004 良好Excellent 安裝
Installation
14 臺鉆stage driller 2 Φ13 北京Beijing 2005 良好Excellent 安裝
Installation
15 移動式空壓機(jī)movable air compressor 1 0.6m3/Min 北京Beijing 2005 良好Excellent 安裝
Installation
16 電動試壓表electric pressure gauge 1 SY-35 北京Beijing 2005 良好Excellent 打壓
Pressing
17 沖擊鉆impact driller 6 北京Beijing 2005 良好Excellent 安裝
Installation
18 對講機(jī)interphone 6 北京Beijing 2005 良好Excellent 聯(lián)絡(luò)Contact
19 氣割工具gas cutting tools 12 sets 上海Shanghai 2005 良好Excellent 安裝
Installation
20 移動噴砂機(jī)movable sand blasting machine 1 上海Shanghai 2005 良好Excellent 安裝
Installation
21 液壓升降車hydraulic lift car 4 5T 上海Shanghai 2005 良好Excellent 安裝
Installation
22 半導(dǎo)體點(diǎn)溫計(jì)semi-conductor point temperature meter 1 95型0-100℃ 上海Shanghai 2005 良好Excellent 測溫
Temperature measuring
23 手動試壓泵manual pressure pump 1 2.5Mpa 北京Beijing 2005 良好Excellent 打壓
Pressing
24 電動試壓泵electric pressure pump 2 北京Beijing 2005 良好Excellent 打壓
Pressing
25 螺旋千斤頂screw jack 4 5t 上海Shanghai 2005 良好Excellent 安裝
Installation
26 螺旋千斤頂screw jack 2 10t 上海Shanghai 2004 良好Excellent 安裝
Installation
27 倒鏈chain block 4 1t 北京Beijing 2005 良好Excellent 安裝
Installation
28 倒鏈chain block 8 5t 北京Beijing 2005 良好Excellent 安裝
Installation
29 電動卷揚(yáng)機(jī)electric hoist 8 5t 北京Beijing 2004 良好Excellent 安裝
Installation
30 打號機(jī)
mark printer 1 北京Beijing 2005 良好Excellent 安裝
Installation
31 普通干溫球溫度計(jì)oridnary dry-bulb temperature meter 1 上海Shanghai 2005 良好Excellent 安裝
Installation
32 手提電焊機(jī) handheld welder 3 6.5KW 北京Beijing 2005 良好Excellent 安裝
Installation
33 數(shù)字萬用表 digital multimeter 1 北京Beijing 2005 良好Excellent 電工
Electricity
34 框式水平儀 frame-type spirit level 1 200×200mm,0.02 mm/m 北京Beijing 2005 良好Excellent 安裝
Installation
35 起重繩索、附件hoisting ropes and accessories complete 北京Beijing 2005 良好Excellent 安裝
Installation
36 個人工機(jī)具individual tools and machines Self-prepare 蘇州suzhou 2005 良好Excellent 安裝
Installation
37 平板振搗器plate vibrator 2 HI×3 北京Beijing 2004 良好Excellent 澆注
Grouting
38 電鋸機(jī)electric sawing machine 1 MJ106 北京Beijing 2005 良好Excellent 澆注
Grouting
39 鋼筋調(diào)直機(jī)steel bar straighting machine 1 G14/4 北京Beijing 2005 良好Excellent 澆注
Grouting
40 鋼筋切斷機(jī)steel bar cutting machine 1 CJ40-1 北京Beijing 2005 澆注
Grouting
41 蛙式打夯機(jī)frog rammer 2 HW-20 北京Beijing 2005 澆注
Grouting
42 小型電動工具small-sized electric tools 6 0.5 KW/臺 廣州Guangzhou 2005 安裝
Installation
三、 冰槽防水保溫施工方案
III. Construction Plan for Water Resistance and Heat Conservation of Ice Tank
蓄冰槽側(cè)壁及底板設(shè)保溫層,由里向外的做法是:找平層、防水層、保溫層、防水層、混凝土板保護(hù)層60mm(底板)。
Heat conservation layer should be installed in the side wall and bottom plate of ice tank. The method from inside to outside is as follows: leveling layer, water resistance layer, heat conservation layer, water resistance layer, concrete plate protective layer 60mm (bottom plate).
1、 保溫、防水材料材質(zhì)
Quality of heat conservation and water resistance materails
保溫層: heat conservation layer:
材質(zhì):擠塑板 material: extruding plate
厚度:≥50mm thickness: ≥50mm
密度:50kg/m3 density: 50kg/m3
導(dǎo)熱系數(shù):≤0.028W/mk heat conduction factor: ≤0.028W/mk
抗壓強(qiáng)度:400kPa pressure resistance strength: 400kPa
防水層: water resistance layer:
材質(zhì):玻璃鋼環(huán)氧樹脂 material: glass steel epoxy resin
厚度:9布10膠無毒、無味材料
Thickness: 9 cloth 10 rubber innocuous and odorless material
拉伸強(qiáng)度:246kPa stretch strength: 246kPa
彎曲強(qiáng)度:296kPa bending strength: 296kPa
沖擊韌性:17.1J/cm2 impact toughness: 17.1J/cm2
氧指數(shù):27.7% oxygen index: 27.7%
2、 找平層
leveling layer
20mm厚有機(jī)硅防水砂漿找平層
20mm organic silicon water resistance mortar leveling layer
池內(nèi)烘干后,將池內(nèi)污物雜質(zhì)清除干凈,用聚合物防水砂漿找平,池底、池壁和頂部做成20mm厚,此防水砂漿應(yīng)抹平壓光、堅(jiān)實(shí)、平穩(wěn)、不起砂、不起皮,不得出現(xiàn)凹凸、裂縫、麻面等現(xiàn)象,做此層時要將池內(nèi)的四角做成圓弧狀,不能做成直角,這樣有利于防水卷材的鋪設(shè)。
After drying in the pond, dirt and sundries in the pond should be eliminated. Polymer water resistance slurry should be adopted to make flatten. The pond bottom, wall and top should be 20mm in thickness. The water resistance slurry should be flattened, polished, solid, stable with no sand, skins, cracks, fissures or pitted skins. The four corners of the pond should be arc circle instead of right corner s. This is good for laying water resistance materials.