Explanation of main measures for the capacity of Mudor Sewage Treatment Plant increased from 16000 m3 / d to 18000 m3 / d

xxx污水處理廠,原設計處理市政生活污水,日處理水量為16000m3/d,采用厭氧+生物濾池工藝,主要構(gòu)筑物有集水井、提升泵房、細格柵、沉砂池、厭氧池、生物濾池和二沉池,F(xiàn)要求處理量增加到18000m3/d,經(jīng)計算,主要限制部分為生物濾池負荷過高,會影響出水水質(zhì),因此增加1座生物濾池,將各水泵等設備更換較大的型號,即可滿足要求。具體計算書如下:

Mudore Sewage Treatment Plant, originally designed for municipal sewage treatment, has a daily water treatment of 16000m3/d and adopts anaerobic together with bio-filter process, which consists of sump, ascension pump room, fine screens, grit chamber, anaerobic digester, bio-filter, secondary sedimentation tank. Now the processing capacity is required to be increased to 18000m3/d. According to the calculation, the main constrained part is the excessive load of bio-filter, which may affect the quality of outflow water. Therefore, with one more bio-filter added and replaced larger size pump, the demand can be satisfied. The specific calculations are as follows:

 

序號

No.

名稱

Description

16000m3/d

18000m3/d

 

 

設計負荷

Design load

設計負荷

Design load

規(guī)范設計負荷

Design capacity specification

備注

Remark

1

厭氧池

Anaerobic tank

計算條件:進水COD按500mg/L計算,厭氧池尺寸:20*10*6(6座)

Calculation condition: inflow capacity shall be calculated as 500mg/L; Anaerobic tank size 20*10*6(6)

計算條件:進水COD按500mg/L計算,厭氧池尺寸:20*10*6(6座)

Calculation condition: inflow capacity shall be calculated as 500mg/L; Anaerobic tank size 20*10*6(6)

 

 

有機負荷:1.21KGCOD/m3*d,

Organic load: 1.21KGCOD/m3*d

有機負荷:1.36KGCOD/m3*d,

Organic load:

1.36KGCOD/m3*d,

1~2kg/m3*d

滿足要求

Meet the requirements

表面負荷:0.55m3/m2*h,

Surface load: 0.55m3/m2*h,

 

表面負荷:0.625m3/m2*h,

Surface load: 0.625m3/m2*h,

0.4~0.8m3/m2*h

滿足要求

Meet the requirements

2

生物濾池 (矯正前)

Bio-filter tank (before correcting)

計算條件:進水BOD150mg/l,出水30mg/l(2座D24*3.5m)

Calculation condition: inflow capacity shall be calculated as BOD150mg/l; outflow capacity is about 30mg/l(2×D24*3.5m)

計算條件:進水BOD150mg/l,出水30mg/l(2座D24*3.5m)

Calculation condition: inflow capacity shall be calculated as BOD150mg/l; outflow capacity is about 30mg/l(2×D24*3.5m)

 

 

BOD5負荷:1333g/m3*d,(2座D24*3.5m)

BOD5 load:1333g/m3*d,(2×D24*3.5m)

 

BOD5負荷:1500g/m3*d,(2座D24*3.5m)

BOD5 load:1333g/m3*d,(2×D24*3.5m)

 

300~1200g/m3*d,

不滿足要求

Fail to meet the requirements

表面負荷:35.56m3/m2*d(回流比 1)

Surface load: 35.56m3/m2*d(reflux ratio: 1)

表面負荷:40m3/m2*d(回流比 1)

Surface load: 40m3/m2*d (reflux ratio: 1)

10~30(含回流)

10~30 (including reflux)

不滿足要求

Fail to meet the requirements

3

二沉池

Secondary sedimentation tank

計算條件:(2座D24*3.5m)

Calculation condition: (2×D24*3.5m)

計算條件:(2座D24*3.5m)

Calculation condition: (2×D24*3.5m)

 

 

表面負荷:0.74m3/m2*h

Surface load: 0.74m3/m2*h

 

表面負荷:0.83m3/m2*h

Surface load: 0.83m3/m2*h

 

1~2m3/m2*h

滿足要求

Meet the requirements

沉淀時間:4.0h

Settling time: 4.0h

沉淀時間:3.6h

Settling time: 3.6h

1.5~2.5h

滿足要求

Meet the requirements

4

生物濾池 (校正后)

Bio-filter tank (after correcting)

計算條件:進水BOD150mg/l,出水30mg/l(3座D24*3.5m)

 

計算條件:進水BOD150mg/l,出水30mg/l(3座D24*3.5m)

 

 

BOD5負荷:888g/m3*d,

BOD5 load: 888g/m3*d,

BOD5負荷:1000g/m3*d,

BOD5 load: 1000g/m3*d,

300~1200g/m3*d,

滿足要求

Meet the requirements

表面負荷:23.70m3/m2*d(回流比 1)

Surface load: 23.70m3/m2*d(reflux ratio: 1)

表面負荷:26.67m3/m2*d(回流比 1)

Surface load: 26.67m3/m2*d (reflux ratio: 1)

10~30(含回流)

10~30 (including reflux)

滿足要求

Meet the requirements